PVC Floor Installation And Laying Process

Many people buy PVC flooring and don’t know how to install it. Today, let’s learn about the PVC floor installation and laying process.

Technical preparations

1.Familiarize yourself carefully and review the floor construction drawings.

2.Clarify the construction content and analyze the characteristics of the project.

3.In response to the requirements of the factory floor, technical clarifications were made to the operators.

Tool preparation

Electric air welding gun V-shaped guillotine knife, serrated scraper, roller, knife, oil brush, cutting knife, scissors, wooden hammer, rubber hammer, plastic bucket, etc.

Workforce preparation

Because the pvc floor installation project is more professional, a fixed professional team is used for construction and installation. The team members have many years of floor construction experience to ensure 100% construction quality.

Material preparation

1.The floor material of this project is pvc coiled material: the board surface is required to be flat and smooth, without cracks, uniform in color, consistent in thickness, and in compliance with design requirements and relevant technical standards.

2.The surface of the electrode should be flat and smooth, without holes, no knots, wrinkles, uniform color, and the composition and performance of the electrode should be the same as that of the floor material.

3.Adhesives require quick-drying, high adhesive strength, strong water resistance, environmentally friendly and non-toxic water-based adhesives and comply with relevant technical standards.

4.Material transportation, the inventory must be stored upright, not flat, stacked, to avoid deformation of the pvc coil, not to be stored in a damp, sun-exposed place, to avoid discoloration of the board surface and uneven color. Adhesives should be stored separately, protected from fire and sunlight.

Operating conditions

1.The ceiling, wall, water, electricity, and plumbing are installed.

2.Indoor painting, grouting, etc. are completed.

3.The base layer has been completed, there is no hollowing, cracking, sanding, oil pollution and other phenomena.

4.The indoor temperature should not be greater than 80%, and the construction environment temperature should not be lower than 10°C.

Construction operation technology

Basic treatment, self-leveling construction, pre-laying, pvc installation, joint welding, cleaning the site.

Grassroots treatment

1.After installation of walls, ceilings, doors and windows, etc., clean the ground debris.

2.Remove sand, oil stains and leftovers on the surface of the base layer.

3.Clean the ground dust and sand.

4.After the ground is thoroughly cleaned, roll the interface agent evenly.

Self-leveling construction

1.Check whether the cement self-leveling meets the relevant technical standards. If expired, the self-leveling shall not be used.

2.Pour an appropriate amount of self-leveling into the dissolver, and dilute the self-leveling with clean water according to the product instructions.

3.Stir thoroughly until the cement self-levels into a fluid state.

4.Sequentially pour the self-leveling on the construction ground and scrape it with a rake tooth scraper, the thickness is about 2-3mm.

5.Pedestrians and stacking items are not allowed within 4 hours after the completion of self-leveling construction.

Pay off

1.According to the design pattern, rubber floor specifications, room size, grid division and elastic line positioning.

2.Pop up the center cross line or diagonal line on the base layer, and pop up the parquet dividing line.

3.The border lines and lines that pop up on the wall must be fine and accurate.

4.Before laying the floor, arrange the lines dry, pre-assemble and number the boards.

PVC floor installation

1.First wipe the ground base layer with a brush or dry towel to clean and remove dust.

2.Apply the paste evenly on the base level with a toothed scraper, pave the board sequentially from the inside to the place, and use a roller or push plate to compact it after one or one construction surface is laid.

3.After the board is laid, judge the dryness and cleanliness of the adhesive according to the temperature, and then perform the board seam welding.

4.Before welding, cut the two adjacent edges into v-shaped grooves. The welding rod adopts the same composition as the plate to be welded, and the temperature is adjusted to 180 degrees with a hot air welding gun;-250 degrees; welding is carried out.

5.After the electrode is cooled, use a spatula to shovel the excess electrode that is higher than the plate surface to be smooth, and be careful not to shovel the floor surface during operation.

The above is the PVC floor installation and laying process that I brought to you. I hope you like it.

Seven Trust

Seven Trust, Author

China's leading wood-plastic manufacturer and supplier. Design inspiration and products - to provide customers with perfect outdoor landscape solutions.

A total of 0 comments

Post a Comment

Contact Details

How Can We Help You?

Request for Approximate Estimation